Complaint to the Department of Emergency Situations
To the Head of the Emergency Department
situations of the East Kazakhstan region of the Ministry of Emergency Situations of the Republic of Kazakhstan
Blialov Rashid To Beketovich
Republic of Kazakhstan, East Kazakhstan region, Ust-Kamenogorsk, ul. Protozanova, 97/1
8 (7232) 25-71-53, 8 777 535 24 69
dchs_vko@emer.kz
from: C kz LLP
represented by Director D. O.F.
BEAN .
Almaty, Tole bi str., ., .. floor.
8 (727) .
Representative by proxy:
Lawyer Sarzhanov Galymzhan Turlybekovich
Law and Law Law Firm
BIN 201240021767
79 Abylai Khan Ave., office 304, Almaty.
info@zakonpravo.kz / www.zakonpravo.kz
+7 708 578 57 58; + 7 727 971 78 58.
Claim
An agreement was concluded with "I. P." LLP:
Subcontract No. 28/10/23 dated September 28, 2023 for the performance of electrical installation work at the multi-storey residential building (position 87) located at 68 Iliyas Yesenberlin St.
Contract No.P 51 dated September 22, 2023 for the installation of a fire alarm system, commissioning in the amount of KZT 1,089,480., located at: located at East Kazakhstan region, Ust-Kamenogorsk Ave. Kanysha Satpayeva, 55/9.
Thus, on the part of "C" LLP. kz" an inspection of the facilities was conducted, where an Act of inspection of the facility was drawn up under the specified contract, as a result, the equipment did not match the approved estimate.
In addition, in accordance with the Contract, the Subcontractor guarantees the high quality of the work performed, in accordance with the current regulatory and technical documentation, GOST SNiP and TU. The warranty period for the work performed by the Subcontractor is set at 60 months from the date of signing the Act of the Working commission for the completed work.
Based on the information provided by the end consumers located at 68 Iliyas Yesenberlin St., etc. Kanysha Satpayeva, 55/9, there are complaints about the malfunction.
And they describe on the object an apartment building located at 68 Iliyas Yesenberlin St., etc. Kanysha Satpayeva, 55/9, Automatic fire alarm system, Central control panel, Devices located on each floor. The entire APS system and the Video surveillance system have critical problems and the need to detect the causes of the failure and eliminate it.
Repeated troubleshooting notifications to the contractor have not yielded results.
Due to the above-mentioned circumstance, we have not received a letter or information about the elimination of defects from I. P. LLP to this day, so we consider I. P. LLP to have not fulfilled its obligations In accordance with clause 8 of the Contract. The subcontractor guarantees high quality of the work performed, in accordance with the current regulatory and technical documentation, GOST SNiP and TU.
According to clause 8.2, the warranty period for the work performed by the Subcontractor is set at 60 months from the date of signing the Act of the Working Commissions for completed work.
We believe that in the event of a fire in a multi-storey building, we are not ready to notify residents properly in advance.
Based on the above,
I ask you to:
· To carry out a comprehensive inspection for the notification of the fire safety system.
With respect,
Proxy Representative Lawyer: Sarzhanov G.T.
Attention!
Law and Law Law Law draws your attention to the fact that this document is basic and does not always meet the requirements of a particular situation. Our lawyers are ready to assist you in legal advice, drawing up any legal document suitable for your situation.
For more information, please contact a Lawyer / Attorney by phone: +7 (708) 971-78-58; +7 (700) 978 5755, +7 (700) 978 5085.
Attorney at Law Almaty Lawyer Legal Services Legal Advice Civil Criminal Administrative Cases Disputes Protection Arbitration Law Firm Kazakhstan Law Office Court Cases
Download document
-
Жалоба в ДЧС ВКО
5 downloads