On Approval of the Criteria for Assessing the Degree of Risk and the Inspection Checklist in the Field of Subsoil Study and Use
Joint Order of the Minister for Investments and Development of the Republic of Kazakhstan dated December 23, 2015 No. 1222 and the Minister of National Economy of the Republic of Kazakhstan dated December 26, 2015 No. 796. Registered with the Ministry of Justice of the Republic of Kazakhstan on December 31, 2015 No. 12699.
In accordance with paragraphs 5 and 6 of Article 141 and paragraph 1 of Article 143 of the Entrepreneurial Code of the Republic of Kazakhstan, WE HEREBY ORDER:
Footnote. The preamble is as amended by the Joint Order of the Acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated May 16, 2023 No. 358 and the Minister of National Economy of the Republic of Kazakhstan dated May 16, 2023 No. 67 (shall enter into force upon the expiry of sixty calendar days after the day of its first official publication).
1. To approve:
1) the criteria for assessing the degree of risk in the field of subsoil study and use, in accordance with Appendix 1 to this Joint Order;
2) the inspection checklist in the field of subsoil study and use with respect to subsoil users carrying out geological exploration of the subsoil, in accordance with Appendix 2 to this Joint Order;
3) the inspection checklist in the field of subsoil study and use with respect to subsoil users carrying out exploration of solid minerals, in accordance with Appendix 3 to this Joint Order;
4) the inspection checklist in the field of subsoil study and use with respect to subsoil users carrying out extraction of common minerals and solid minerals, with the exception of uranium, in accordance with Appendix 4 to this Joint Order;
5) the inspection checklist in the field of subsoil study and use with respect to subsoil users carrying out the use of subsoil space, in accordance with Appendix 5 to this Joint Order;
6) the inspection checklist in the field of subsoil study and use with respect to subsoil users carrying out artisanal mining, in accordance with Appendix 6 to this Joint Order;
7) the inspection checklist in the field of subsoil study and use with respect to subsoil users carrying out the recording, storage, preservation and ensuring the reliability of geological information, in accordance with Appendix 7 to this Joint Order;
8) the inspection checklist in the field of subsoil study and use with respect to subsoil users carrying out geological exploration of the subsoil, exploration of solid minerals, extraction of common minerals and solid minerals, with the exception of uranium, artisanal mining, use of subsoil space, recording, storage, preservation and ensuring the reliability of geological information, in accordance with Appendix 8 to this Joint Order.
Footnote. Paragraph 1 is as amended by the Joint Order of the Acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated May 16, 2023 No. 358 and the Minister of National Economy of the Republic of Kazakhstan dated May 16, 2023 No. 67 (shall enter into force upon the expiry of sixty calendar days after the day of its first official publication).
2. To declare invalid the Joint Order of the Minister for Investments and Development of the Republic of Kazakhstan dated June 30, 2015 No. 740 and the Minister of National Economy of the Republic of Kazakhstan dated July 20, 2015 No. 538 "On Approval of the Criteria for Assessing the Degree of Risk in the Field of Subsoil Study and Use and the Form of the Inspection Checklist in the Field of Subsoil Study and Use" (registered in the Register of Regulatory Legal Acts under No. 12064, published in the information and legal system "Adilet" on October 5, 2015).
3. The Committee of Geology and Subsoil Use of the Ministry for Investments and Development of the Republic of Kazakhstan (B.K. Nurabayev) shall ensure:
1) state registration of this Joint Order with the Ministry of Justice of the Republic of Kazakhstan;
2) within ten calendar days after state registration of this Joint Order with the Ministry of Justice of the Republic of Kazakhstan, forwarding a copy thereof in printed and electronic form for official publication in periodical printed publications and in the information and legal system "Adilet", as well as to the Republican Center for Legal Information for inclusion in the Reference Control Bank of Regulatory Legal Acts of the Republic of Kazakhstan;
3) posting this Joint Order on the Internet resource of the Ministry for Investments and Development of the Republic of Kazakhstan and on the intranet portal of state bodies;
4) within ten working days after state registration of this Joint Order with the Ministry of Justice of the Republic of Kazakhstan, submitting to the Legal Department of the Ministry for Investments and Development of the Republic of Kazakhstan information on the implementation of the measures provided for in subparagraphs 1), 2) and 3) of paragraph 3 of this Order.
4. Control over the implementation of this Joint Order shall be entrusted to the Vice-Minister for Investments and Development of the Republic of Kazakhstan supervising the relevant area.
5. This Joint Order shall enter into force upon the expiry of ten calendar days after the day of its first official publication.
| Minister for Investments and Development of the Republic of Kazakhstan __________ A. Issekeshev | Minister of National Economy of the Republic of Kazakhstan __________ E. Dossayev |
|---|
"AGREED"
Chairman of the Committee on Legal
Statistics and Special Records
of the General Prosecutor's Office
of the Republic of Kazakhstan
__________ S. Aitpayeva
December 28, 2015
| Appendix 1 to the Joint Order of the Minister for Investments and Development of the Republic of Kazakhstan dated December 23, 2015 No. 1222 and the Minister of National Economy of the Republic of Kazakhstan dated December 26, 2015 No. 796 |
|---|
Criteria for Assessing the Degree of Risk in the Field of Subsoil Study and Use
Footnote. Appendix 1 is as amended by the Joint Order of the Acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated May 16, 2023 No. 358 and the Minister of National Economy of the Republic of Kazakhstan dated May 16, 2023 No. 67 (shall enter into force upon the expiry of sixty calendar days after the day of its first official publication).
Chapter 1. General Provisions
1. These criteria for risk assessment and management in the field of subsoil study and use (hereinafter referred to as the Criteria) have been developed for the selection of controlled entities (facilities) subject to inspections in accordance with Article 141, paragraph 3 of Article 143 of the Entrepreneurial Code of the Republic of Kazakhstan, the Order of the Acting Minister of National Economy of the Republic of Kazakhstan "On Approval of the Inspection Checklist Form" dated July 31, 2018 No. 3 (registered in the State Register of Regulatory Legal Acts under No. 17371), and the Order of the Minister of National Economy of the Republic of Kazakhstan "On Amendments to the Order of the Acting Minister of National Economy of the Republic of Kazakhstan dated June 22, 2022 No. 48 'On Approval of the Rules for the Formation of the Risk Assessment and Management System by Regulatory State Bodies and on Amendments to the Order of the Acting Minister of National Economy of the Republic of Kazakhstan dated July 31, 2018 No. 3 "On Approval of the Rules for the Formation of the Risk Assessment System and the Form of Inspection Checklists by State Bodies"'" (registered in the State Register of Regulatory Legal Acts under No. 28577), and for the purpose of conducting preventive control with a visit to the controlled entity (facility).
2. The following concepts are used in these Criteria:
1) score – a quantitative measure of risk calculation;
2) data normalization – a statistical procedure providing for the conversion of values measured on different scales to a conditionally common scale;
3) risk – the probability of harm being caused as a result of the activities of a controlled entity to human life or health, the environment, the legitimate interests of individuals and legal entities, and the property interests of the state, taking into account the severity of its consequences;
4) risk assessment and management system – a process of making management decisions aimed at reducing the probability of adverse factors occurring by distributing controlled entities (facilities) according to risk levels for the subsequent implementation of preventive control with a visit to the controlled entity (facility), with the aim of imposing the minimum possible restrictions on freedom of entrepreneurship while ensuring an acceptable level of risk in the relevant fields of activity, as well as aimed at changing the risk level for a specific controlled entity (facility) and/or exempting such controlled entity (facility) from preventive control with a visit to the controlled entity (facility);
5) objective criteria for assessing the degree of risk (hereinafter referred to as objective criteria) – criteria for assessing the degree of risk used to select controlled entities (facilities) depending on the degree of risk in a particular field of activity and not directly dependent on an individual controlled entity (facility);
6) criteria for assessing the degree of risk – a set of quantitative and qualitative indicators related to the direct activities of a controlled entity, the specific features of sectoral development and the factors affecting such development, which make it possible to classify controlled entities (facilities) into different risk levels;
7) subjective criteria for assessing the degree of risk (hereinafter referred to as subjective criteria) – criteria for assessing the degree of risk used to select controlled entities (facilities) depending on the results of the activities of a specific controlled entity (facility);
8) inspection checklist – a list of requirements imposed on the activities of controlled entities (facilities), non-compliance with which entails a threat to human life and health, the legitimate interests of individuals and legal entities, and the state;
9) sample population (sample) – a list of assessed entities (facilities) classified as a homogeneous group of controlled entities (facilities) in a specific field of state control, in accordance with paragraph 2 of Article 143 of the Code.
3. Controlled entities shall be classified by risk levels on the basis of objective criteria and subjective criteria.
State control over artisanal mining operations and the extraction of common minerals shall be carried out by the relevant local executive bodies of the regions, cities of republican significance and the capital.
Chapter 2. Procedure for Forming the Risk Assessment and Management System When Conducting Preventive Control of Controlled Entities (Facilities)
4. Risk management when carrying out preventive control with a visit to a controlled entity (facility) is formed by determining objective and subjective criteria, which are established in stages (Multi-Criteria Decision Analysis).
At the first stage, based on objective criteria, controlled entities (facilities) are classified into one of the following risk levels:
1) high risk;
2) medium risk;
3) low risk.
With respect to controlled entities (facilities) classified as having a high and medium risk level according to objective criteria, preventive control with a visit to the controlled entity (facility), preventive control without a visit to the controlled entity (facility), and unscheduled inspections shall be applied.
With respect to controlled entities (facilities) classified as having a low risk level according to objective criteria, preventive control without a visit to the controlled entity (facility) and unscheduled inspections shall be applied.
At the second stage, based on subjective criteria, controlled entities (facilities) are classified into one of the following risk levels:
1) high risk;
2) medium risk;
3) low risk.
According to the risk level indicators based on subjective criteria, a controlled entity (facility) shall be classified as:
1) high risk – where the risk level indicator ranges from 71 to 100 inclusive;
2) medium risk – where the risk level indicator ranges from 31 to 70 inclusive;
3) low risk – where the risk level indicator ranges from 0 to 30 inclusive.
5. Criteria for assessing the degree of risk for conducting preventive control of controlled entities (facilities) are formed by determining objective and subjective criteria.
Paragraph 1. Objective Criteria
6. Assessment of the degree of risk of controlled entities based on objective criteria and their classification as having a low, medium or high risk level shall be carried out according to indicators of the highest probability of harm being caused to the environment, the legitimate interests of individuals and legal entities, and the property interests of the state as a result of the activities of a controlled entity, taking into account the severity of its consequences.
According to objective criteria, controlled entities carrying out activities involving the use of subsoil space, extraction of solid and common minerals, with the exception of uranium extraction operations, and artisanal mining shall be classified as high risk; controlled entities carrying out activities involving the exploration of solid minerals, geological exploration of the subsoil, as well as the recording, storage, preservation and ensuring the reliability of geological information shall be classified as medium risk.
Paragraph 2. Subjective Criteria
7. Subjective criteria shall be determined through the following stages:
1) formation of a database and collection of information;
2) analysis of information and risk assessment.
8. Formation of a database and collection of information are necessary to identify controlled entities that violate the legislation of the Republic of Kazakhstan in the field of subsoil use.
The processes of information collection and processing are fully automated and allow for verification of the accuracy of the data obtained.
The following sources of information shall be used to assess the degree of risk:
1) results of monitoring reports and information submitted by the controlled entity, conducted by state bodies;
2) results of previous inspections and preventive control with visits to controlled entities (facilities);
3) results of preventive control without a visit to the controlled entity (facility) (final documents issued following preventive control without a visit to the controlled entity (facility) (certificate, conclusion, recommendations);
9. For the purpose of implementing the principle of encouraging conscientious controlled entities and concentrating control on violators, controlled entities (facilities) shall be exempted from preventive control with a visit to the controlled entity (facility) and/or for a period determined by the subjective criteria for assessing the degree of risk of the regulatory state body.
10. Controlled entities (facilities), based on subjective criteria, shall be transferred through the information system from a high risk level to a medium risk level or from a medium risk level to a low risk level in the relevant fields of activity of controlled entities in the following cases:
1) if such entities have concluded civil liability insurance contracts in respect of third parties in the cases and in the manner established by the laws of the Republic of Kazakhstan;
2) if the laws of the Republic of Kazakhstan and the criteria for assessing the degree of risk of regulatory state bodies specify cases of exemption from preventive control with a visit to the controlled entity (facility);
3) if the entities are members of a self-regulatory organization based on voluntary membership (participation) in accordance with the Law of the Republic of Kazakhstan "On Self-Regulation", with which an agreement on recognition of the results of the activities of the self-regulatory organization has been concluded.
11. If a controlled entity has a mitigating indicator, a controlled entity carrying out activities involving the recording, storage, preservation and ensuring the reliability of geological information shall be exempted from the relevant preventive control with visits to controlled entities (facilities).
The following shall be considered a mitigating indicator:
The "State Subsoil Data Bank" information system is used until the creation and implementation of the unified subsoil use platform "Minerals.gov.kz" in accordance with Article 39-1 of the Law of the Republic of Kazakhstan "On Informatization".
12. Subjective criteria have been developed on the basis of the requirements of inspection checklists, non-compliance with which corresponds to a specific degree of violation in accordance with the criteria for assessing the degree of risk. A degree of violation – gross, significant or minor – shall be determined for each requirement in the inspection checklists.
At the same time, the definitions of gross, significant and minor violations shall be established in the criteria for assessing the degree of risk, taking into account the specifics of the relevant field of state control.
When forming subjective criteria, the degree of violation (gross, minor, significant) shall be assigned in accordance with the established definitions of gross, minor and significant violations.
Based on the sources of information specified in paragraph 8 of these Criteria, and in accordance with the established definitions of gross, significant and minor violations, subjective criteria for assessing the degree of risk in the field of subsoil study and use have been determined in accordance with the Appendix to these Criteria.
13. Analysis and assessment of subjective criteria will make it possible to concentrate preventive control with a visit to the controlled entity (facility) on the controlled entity (facility) with the highest potential risk.
Controlled entities that have fully remedied the violations identified following previous preventive control with a visit shall not be included when preparing schedules and lists for the next period of state control.
At the same time, during analysis and assessment, data from subjective criteria previously taken into account and used in respect of a specific controlled entity (facility), or data for which the limitation period has expired in accordance with the legislation of the Republic of Kazakhstan, shall not be applied.
14. Based on the priority of the information sources used and the significance of the indicators of subjective criteria, the risk level indicator based on subjective criteria shall be calculated on a scale from 0 to 100 points in accordance with the procedure for calculating the risk level indicator based on subjective criteria specified in Chapter 3 of these Rules.
15. The priority of the information sources used and the significance of the indicators of subjective criteria shall be established in accordance with the list of subjective criteria for determining the degree of risk based on subjective criteria with respect to:
1) subsoil users carrying out geological exploration of the subsoil, in accordance with Appendix 2 to the Criteria;
2) subsoil users carrying out exploration of solid minerals, in accordance with Appendix 3 to the Criteria;
3) subsoil users carrying out extraction of common minerals and solid minerals, with the exception of uranium, in accordance with Appendix 4 to the Criteria;
4) subsoil users carrying out the use of subsoil space, in accordance with Appendix 5 to the Criteria.
Paragraph 3. Specific Features of Forming the Risk Assessment and Management System
16. The risk assessment and management system shall be maintained using the Minerals.gov.kz information system and other information systems that classify controlled entities (facilities) into specific risk levels and generate schedules or lists for conducting control measures, and shall also be based on state statistics, the results of departmental statistical monitoring, and information tools.
17. The calculation of the risk level indicator based on subjective criteria, as well as the risk level indicators according to which a controlled entity is classified as having a high, medium or low risk level, shall be established in the criteria for assessing the degree of risk in accordance with the list of subjective criteria for determining the degree of risk based on subjective criteria pursuant to paragraph 13 of these Criteria.
Chapter 3. Procedure for Calculating the Degree of Risk Based on Subjective Criteria
18. The following procedure shall be applied to calculate the risk level indicator for classifying a controlled entity into a risk level.
If one gross violation is identified, the risk level indicator of the controlled entity shall be equated to 100, and preventive control with a visit to the controlled entity (facility) shall be conducted in respect thereof.
If no gross violations are identified, the total indicator for significant and minor violations shall be calculated in order to determine the risk level indicator.
When determining the indicator for significant violations, a coefficient of 0.7 shall be applied, and this indicator shall be calculated using the following formula:
SРз = (SР2 х 100/SР1) х 0.7,
where:
SРз – indicator of significant violations;
SР1 – required number of significant violations;
SР2 – number of significant violations identified;
When determining the indicator for minor violations, a coefficient of 0.3 shall be applied, and this indicator shall be calculated using the following formula:
SРн = (SР2 х 100/SР1) х 0.3,
where:
SРн – indicator of minor violations;
SР1 – required number of minor violations;
SР2 – number of minor violations identified;
The overall risk level indicator (SР) shall be calculated on a scale from 0 to 100 and determined by summing the indicators of significant and minor violations using the following formula:
SР = SРз + SРн,
where:
SР – overall risk level indicator;
SРз – indicator of significant violations;
SРн – indicator of minor violations.
19. The risk level indicator based on subjective criteria, determined in accordance with paragraph 8 of these Criteria, shall be calculated on a scale from 0 to 100 points using the following formula:
xi – indicator of the subjective criterion,
wi – specific weight of the subjective criterion indicator xi,
n – number of indicators.
The resulting value of the risk level indicator based on subjective criteria, determined in accordance with paragraph 8 of these Criteria, shall be included in the calculation of the risk level indicator based on subjective criteria.
20. The values calculated for controlled entities (facilities) for indicator R shall be normalized to a range from 0 to 100 points. Data normalization shall be carried out for each sample population (sample) using the following formula:
R – risk level indicator (final) based on subjective criteria for an individual controlled entity (facility),
Rmax – maximum possible value on the scale of risk levels based on subjective criteria for controlled entities (facilities) included in one sample population (sample) (upper limit of the scale),
Rmin – minimum possible value on the scale of risk levels based on subjective criteria for controlled entities (facilities) included in one sample population (sample) (lower limit of the scale),
Rпром – intermediate risk level indicator based on subjective criteria, calculated in accordance with paragraph 10 of these Criteria.
Chapter 4. Inspection Checklists
21. Inspection checklists shall be drawn up for homogeneous groups of controlled entities (facilities) and shall include requirements in accordance with paragraph 2 of Article 132 of the Code and subject to the conditions specified in paragraph 2 of Article 143 of the Code.
22. Inspection checklists shall be prepared in the form set out in Appendix 1 to the Criteria.
| Appendix 1 to the Criteria for Assessing the Degree of Risk in the Field of Subsoil Study and Use |
|---|
Degrees of Violation of Requirements Imposed on Controlled Entities (Facilities) in the Field of Subsoil Study and Use
| No. | Criteria | Degree of Violation |
|---|---|---|
| 1 | 2 | 3 |
| 1 | Failure to remedy, within the prescribed period, violations identified as a result of preventive control without visiting the controlled entity (facility), as well as failure to submit, within the prescribed period, an action plan for remedying violations | Severe |
| 2 | Failure to submit (no later than April 30 of each year), or falsification of periodic geological reports | Significant |
| 3 | Failure to submit reports on extracted precious metals and precious stones, common minerals and solid minerals, with the exception of uranium | Significant |
| 4 | Compliance with the spatial boundaries of the subsoil plot when conducting subsoil geological exploration operations | Severe |
| 5 | Compliance with the requirements of project documents (geological exploration plan, prospecting and evaluation work project for groundwater) when conducting subsoil geological exploration | Significant |
| 6 | Compliance with the spatial boundaries of the subsoil plot when conducting solid mineral exploration operations | Severe |
| 7 | Compliance with the requirements for documenting solid mineral exploration works and recording all information necessary for reliable study of the subsoil | Significant |
| 8 | Compliance with the prohibition on erecting permanent structures on an exploration plot, as well as placing man-made mineral formations of mining and processing facilities | Severe |
| 9 | Conducting solid mineral exploration operations using the types, methods and techniques of work предусмотренные проектным документом | Significant |
| 10 | Conducting solid mineral exploration operations only after submitting a copy of the exploration plan to the authorized body in the field of solid minerals | Severe |
| 11 | Compliance with the prohibition on conducting exploration works not предусмотренные в плане разведки, представленном уполномоченному органу в области твердых полезных ископаемых | Significant |
| 12 | Compliance with the spatial boundaries of the subsoil plot when conducting extraction operations | Severe |
| 13 | Compliance with the requirements for documenting all extraction works. The documentation shall include a description of the works necessary for the reliable study and subsequent development of the subsoil plot | Severe |
| 14 | Compliance with the spatial boundaries of the subsoil plot when conducting operations involving the use of underground space | Severe |
| 15 | Use of underground space in accordance with the project document | Severe |
| 16 | Availability of reliable records when storing and/or burying solid, liquid and radioactive waste, harmful toxic substances, and discharging (injecting) wastewater, industrial and technical water | Severe |
| 17 | Compliance with the spatial boundaries of the subsoil plot when conducting artisanal mining within the subsoil plot | Severe |
| 18 | Availability of records and preservation of geological information and its carriers obtained as a result of subsoil use operations, as well as unobstructed access thereto for representatives of the authorized body for subsoil study for the purposes of research or inspection | Severe |
| 19 | Submission to the authorized body for subsoil study of reports on the operation of underground structures | Severe |
| 20 | Ensuring the reliability and preservation of all primary and secondary geological information obtained during the use of underground space, including laboratory research and analysis data | Severe |
| 21 | Compliance with the requirements for documenting all works involving the use of underground space. The documentation shall include a description of the works necessary for the reliable study and subsequent development of the subsoil plot | Significant |
| 22 | Ensuring reliable accounting of extracted minerals and production waste generated during extraction | Severe |
| 23 | Availability of mine surveying documentation | Significant |
| 24 | Availability of a project document providing for the conduct of subsoil use operations | Severe |
| 25 | Availability of approvals of the mining operations plan | Severe |
| 26 | Conducting extraction operations using the types, methods and techniques of work предусмотренные проектным документом | Severe |
| 27 | Compliance with the prohibition on conducting works under an amended mining operations plan before submitting it to the authorized body in the field of solid minerals | Severe |
| 28 | Compliance with the prohibition on using excavators and bulldozers on water bodies and lands of the water fund falling within the artisanal mining plot, using chemical reagents and explosives, erecting and constructing permanent structures, and removing soil and extracted rock mass beyond the artisanal mining plot | Severe |
| 29 | Availability of an artisanal mining plan when using mechanized equipment | Insignificant |
| Appendix 2 to the Criteria for Assessing the Degree of Risk in the Field of Subsoil Study and Use |
|---|
List of Subjective Criteria for Determining the Degree of Risk Based on Subjective Criteria in the Field of Subsoil Study and Use in Accordance with Article 138 of the Entrepreneurial Code of the Republic of Kazakhstan in Respect of Subsoil Users Carrying Out Geological Exploration of the Subsoil
Download
| No. | Indicator of the subjective criterion | Source of data for the subjective criterion indicator | Specific weight, points | Condition 1 | Condition 2 |
|---|---|---|---|---|---|
| Condition 1/value | Condition 2/value | ||||
| 1 | Failure to submit (no later than April 30 of each year) periodic geological reports 1-GIN; | Clause 11.1, results of monitoring reports and information submitted by the controlled entity | 50 | 0 cases | 1 case |
| 0% | 100% | ||||
| 2 | Failure to remedy, within the prescribed period, violations identified as a result of preventive control (final documents issued following preventive control without visiting the controlled entity (facility) (statement, conclusion, recommendations)) | Clause 11.6, results of preventive control without visiting the controlled entity (facility) (final documents issued following preventive control without visiting the controlled entity (facility)) | 50 | 0 | 1 violation |
| 0% | 100% |
| Appendix 3 to the Criteria for Assessing the Degree of Risk in the Field of Subsoil Study and Use |
|---|
List of Subjective Criteria for Determining the Degree of Risk Based on Subjective Criteria in the Field of Subsoil Study and Use in Accordance with Article 138 of the Entrepreneurial Code of the Republic of Kazakhstan in Respect of Subsoil Users Carrying Out Exploration for Solid Minerals
Download
| No. | Indicator of the subjective criterion | Source of data for the subjective criterion indicator | Specific weight, points | Condition 1 | Condition 2 |
|---|---|---|---|---|---|
| Condition 1/value | Condition 2/value | ||||
| 1 | Failure to submit (no later than April 30 of each year) periodic geological reports 1-GIN; | Clause 11.1, results of monitoring reports and information submitted by the controlled entity | 60 | 0 cases | 1 case |
| 0% | 100% | ||||
| 2 | Submission of reports on subsoil use operations in cases предусмотренных Кодексом 1-LKU, 1-LO; | Clause 11.1, results of monitoring reports and information submitted by the controlled entity | 40 | 0 cases | 1 case |
| 0% | 100% | ||||
| 3 | Failure to remedy, within the prescribed period, violations identified as a result of preventive control (final documents issued following preventive control without visiting the controlled entity (facility) (statement, conclusion, recommendations)) | Clause 11.6, results of preventive control without visiting the controlled entity (facility) (final documents issued following preventive control without visiting the controlled entity (facility)) | 100 | 0 | 1 violation |
| 0% | 100% |
| Appendix 4 to the Criteria for Assessing the Degree of Risk in the Field of Subsoil Study and Use |
|---|
List of Subjective Criteria for Determining the Degree of Risk Based on Subjective Criteria in the Field of Subsoil Study and Use in Accordance with Article 138 of the Entrepreneurial Code of the Republic of Kazakhstan in Respect of Subsoil Users Carrying Out Extraction of Common Minerals and Solid Minerals, with the Exception of Uranium
Download
| No. | Indicator of the subjective criterion | Source of data for the subjective criterion indicator | Specific weight, points | Condition 1 | Condition 2 |
|---|---|---|---|---|---|
| Condition 1/value | Condition 2/value | ||||
| 1 | Failure to submit reports on extracted precious metals and precious stones, common minerals and solid minerals, with the exception of uranium (1-TPI; 1.1-TPI; 2-OPI; 2.1-OPI; 3-ST) | Clause 11.1, results of monitoring reports and information submitted by the controlled entity | 60 | 0 | 1 case |
| 0% | 100% | ||||
| 2 | Submission of reports on subsoil use operations in cases предусмотренных Кодексом 1-LKU, 1-LO; | Clause 11.1, results of monitoring reports and information submitted by the controlled entity | 40 | 0 cases | 1 case |
| 0% | 100% | ||||
| 3 | Failure to remedy, within the prescribed period, violations identified as a result of preventive control (final documents issued following preventive control without visiting the controlled entity (facility) (statement, conclusion, recommendations)) | Clause 11.6, results of preventive control without visiting the controlled entity (facility) (final documents issued following preventive control without visiting the controlled entity (facility)) | 100 | 0 | 1 violation |
| 0% | 100% |
| Appendix 5 to the Criteria for Assessing the Degree of Risk in the Field of Subsoil Study and Use |
|---|
List of Subjective Criteria for Determining the Degree of Risk Based on Subjective Criteria in the Field of Subsoil Study and Use in Accordance with Article 138 of the Entrepreneurial Code of the Republic of Kazakhstan in Respect of Subsoil Users Carrying Out the Use of Underground Space
Download
| No. | Indicator of the subjective criterion | Source of data for the subjective criterion indicator | Specific weight, points | Condition 1 | Condition 2 |
|---|---|---|---|---|---|
| Condition 1/value | Condition 2/value | ||||
| 1 | Failure to remedy, within the prescribed period, violations identified as a result of preventive control (final documents issued following preventive control without visiting the controlled entity (facility) (statement, conclusion, recommendations)) | Clause 11.6, results of preventive control without visiting the controlled entity (facility) (final documents issued following preventive control without visiting the controlled entity (facility)) | 100 | 0 | 1 violation |
| 0% | 100% |
| Appendix 2 to the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated December 23, 2015 No. 1222 and the Minister of National Economy of the Republic of Kazakhstan dated December 26, 2015 No. 796 |
|---|
Inspection Checklist in the Field of Subsoil Study and Use
Footnote. Appendix 2 is worded as amended by the Joint Order of the Acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated May 16, 2023 No. 358 and the Minister of National Economy of the Republic of Kazakhstan dated May 16, 2023 No. 67 (shall enter into force upon the expiration of sixty calendar days after the day of its first official publication).
In respect of: subsoil users carrying out geological exploration of the subsoil
Name of the homogeneous group of controlled entities (facilities)
State body that ordered the inspection/preventive control with a visit to the controlled entity (facility)
Act on ordering the inspection/preventive control with a visit to the controlled entity (facility)
No., date
Name of the controlled entity (facility)
(Individual Identification Number), Business Identification Number of the controlled entity (facility)
Location address
Download
| No. | List of Requirements | Complies with Requirements | Does Not Comply with Requirements |
|---|---|---|---|
| 1 | 2 | 3 | 4 |
| 1 | Compliance with the spatial boundaries of the subsoil plot when conducting subsoil geological exploration operations | ||
| 2 | Compliance with the requirements of project documents (geological exploration plan, prospecting and evaluation work project for groundwater) when conducting subsoil geological exploration |
Official(s)
Position, signature
Surname, first name, patronymic (if any)
Head of the controlled entity
Position, signature
Surname, first name, patronymic (if any)
| Appendix 3 to the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated December 23, 2015 No. 1222 and the Minister of National Economy of the Republic of Kazakhstan dated December 26, 2015 No. 796 |
|---|
Inspection Checklist in the Field of Subsoil Study and Use
Footnote. The Order was supplemented by Appendix 3 in accordance with the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated November 9, 2018 No. 779 and the Minister of National Economy of the Republic of Kazakhstan dated November 11, 2018 No. 63 (shall enter into force upon the expiration of ten calendar days after the day of its first official publication); as amended by the Joint Order of the Acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated May 16, 2023 No. 358 and the Minister of National Economy of the Republic of Kazakhstan dated May 16, 2023 No. 67 (shall enter into force upon the expiration of sixty calendar days after the day of its first official publication).
In respect of: subsoil users carrying out exploration for solid minerals
Name of the homogeneous group of controlled entities (facilities)
State body that ordered the inspection/preventive control with a visit to the controlled entity (facility)
Act on ordering the inspection/preventive control with a visit to the controlled entity (facility)
No., date
Name of the controlled entity (facility)
(Individual Identification Number), Business Identification Number of the controlled entity (facility)
Location address
Download
| No. | List of Requirements | Complies with Requirements | Does Not Comply with Requirements |
|---|---|---|---|
| 1 | 2 | 3 | 4 |
| 1 | Compliance with the spatial boundaries of the subsoil plot when conducting solid mineral exploration operations | ||
| 2 | Availability of a project document providing for the conduct of subsoil use operations | ||
| 3 | Compliance with the requirements for documenting solid mineral exploration works and recording all information necessary for reliable study of the subsoil | ||
| 4 | Compliance with the prohibition on erecting permanent structures on an exploration plot, as well as placing man-made mineral formations of mining and processing facilities | ||
| 5 | Conducting solid mineral exploration operations using the types, methods and techniques of work предусмотренные проектным документом | ||
| 6 | Conducting solid mineral exploration operations only after submitting a copy of the exploration plan to the authorized body in the field of solid minerals | ||
| 7 | Compliance with the prohibition on conducting exploration works not предусмотренные в плане разведки, представленном уполномоченному органу в области твердых полезных ископаемых |
Official(s)
Position, signature
Surname, first name, patronymic (if any)
Head of the controlled entity
Position, signature
Surname, first name, patronymic (if any)
| Appendix 4 to the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated December 23, 2015 No. 1222 and the Minister of National Economy of the Republic of Kazakhstan dated December 26, 2015 No. 796 |
|---|
Inspection Checklist in the Field of Subsoil Study and Use
Footnote. The Order was supplemented by Appendix 4 in accordance with the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated November 9, 2018 No. 779 and the Minister of National Economy of the Republic of Kazakhstan dated November 11, 2018 No. 63 (shall enter into force upon the expiration of ten calendar days after the day of its first official publication); as amended by the Joint Order of the Acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated May 16, 2023 No. 358 and the Minister of National Economy of the Republic of Kazakhstan dated May 16, 2023 No. 67 (shall enter into force upon the expiration of sixty calendar days after the day of its first official publication).
In respect of: subsoil users carrying out extraction of common minerals and solid minerals, with the exception of uranium
Name of the homogeneous group of controlled entities (facilities)
State body that ordered the inspection/preventive control with a visit to the controlled entity (facility)
Act on ordering the inspection/preventive control with a visit to the controlled entity (facility)
No., date
Name of the controlled entity (facility)
(Individual Identification Number), Business Identification Number of the controlled entity (facility)
Location address
Download
| No. | List of Requirements | Complies with Requirements | Does Not Comply with Requirements |
|---|---|---|---|
| 1 | 2 | 3 | 4 |
| 1 | Compliance with the spatial boundaries of the subsoil plot when conducting extraction operations | ||
| 2 | Compliance with the requirements for documenting all extraction works. The documentation shall include a description of the works necessary for the reliable study and subsequent development of the subsoil plot | ||
| 3 | Ensuring reliable accounting of extracted minerals and production waste generated during extraction | ||
| 4 | Availability of mine surveying documentation | ||
| 5 | Availability of a project document providing for the conduct of subsoil use operations | ||
| 6 | Availability of approvals of the mining operations plan | ||
| 7 | Conducting extraction operations using the types, methods and techniques of work предусмотренные проектным документом | ||
| 8 | Compliance with the prohibition on conducting works under an amended mining operations plan before submitting it to the authorized body in the field of solid minerals |
Official(s)
Position, signature
Surname, first name, patronymic (if any)
Head of the controlled entity
Position, signature
Surname, first name, patronymic (if any)
| Appendix 5 to the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated December 23, 2015 No. 1222 and the Minister of National Economy of the Republic of Kazakhstan dated December 26, 2015 No. 796 |
|---|
Inspection Checklist in the Field of Subsoil Study and Use
Footnote. The Order was supplemented by Appendix 5 in accordance with the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated November 9, 2018 No. 779 and the Minister of National Economy of the Republic of Kazakhstan dated November 11, 2018 No. 63 (shall enter into force upon the expiration of ten calendar days after the day of its first official publication); as amended by the Joint Order of the Acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated May 16, 2023 No. 358 and the Minister of National Economy of the Republic of Kazakhstan dated May 16, 2023 No. 67 (shall enter into force upon the expiration of sixty calendar days after the day of its first official publication).
In respect of: subsoil users carrying out the use of underground space
Name of the homogeneous group of controlled entities (facilities)
State body that ordered the inspection/preventive control with a visit to the controlled entity (facility)
Act on ordering the inspection/preventive control with a visit to the controlled entity (facility)
No., date
Name of the controlled entity (facility)
(Individual Identification Number), Business Identification Number of the controlled entity (facility)
Location address
Download
| No. | List of Requirements | Complies with Requirements | Does Not Comply with Requirements |
|---|---|---|---|
| 1 | 2 | 3 | 4 |
| 1 | Compliance with the spatial boundaries of the subsoil plot when conducting operations involving the use of underground space | ||
| 2 | Use of underground space in accordance with the project document | ||
| 3 | Availability of reliable records when storing and/or burying solid, liquid and radioactive waste, harmful toxic substances, and discharging (injecting) wastewater, industrial and technical water |
Official(s)
Position, signature
Surname, first name, patronymic (if any)
Head of the controlled entity
Position, signature
Surname, first name, patronymic (if any)
| Appendix 6 to the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated December 23, 2015 No. 1222 and the Minister of National Economy of the Republic of Kazakhstan dated December 26, 2015 No. 796 |
|---|
Inspection Checklist in the Field of Subsoil Study and Use
Footnote. The Order was supplemented by Appendix 6 in accordance with the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated November 9, 2018 No. 779 and the Minister of National Economy of the Republic of Kazakhstan dated November 11, 2018 No. 63 (shall enter into force upon the expiration of ten calendar days after the day of its first official publication); as amended by the Joint Order of the Acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated May 16, 2023 No. 358 and the Minister of National Economy of the Republic of Kazakhstan dated May 16, 2023 No. 67 (shall enter into force upon the expiration of sixty calendar days after the day of its first official publication).
In respect of: subsoil users carrying out artisanal mining
Name of the homogeneous group of controlled entities (facilities)
State body that ordered the inspection/preventive control with a visit to the controlled entity (facility)
Act on ordering the inspection/preventive control with a visit to the controlled entity (facility)
No., date
Name of the controlled entity (facility)
(Individual Identification Number), Business Identification Number of the controlled entity (facility)
Location address
Download
| No. | List of Requirements | Complies with Requirements | Does Not Comply with Requirements |
|---|---|---|---|
| 1 | 2 | 3 | 4 |
| 1 | Compliance with the spatial boundaries of the subsoil plot when conducting artisanal mining within the subsoil plot | ||
| 2 | Compliance with the prohibition on using excavators and bulldozers on water bodies and lands of the water fund falling within the artisanal mining plot, using chemical reagents and explosives, erecting and constructing permanent structures, and removing soil and extracted rock mass beyond the artisanal mining plot | ||
| 3 | Availability of an artisanal mining plan when using mechanized equipment |
Official(s)
Position, signature
Surname, first name, patronymic (if any)
Head of the controlled entity
Position, signature
Surname, first name, patronymic (if any)
| Appendix 7 to the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated December 23, 2015 No. 1222 and the Minister of National Economy of the Republic of Kazakhstan dated December 26, 2015 No. 796 |
|---|
Inspection Checklist in the Field of Subsoil Study and Use
Footnote. The Order was supplemented by Appendix 7 in accordance with the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated November 9, 2018 No. 779 and the Minister of National Economy of the Republic of Kazakhstan dated November 11, 2018 No. 63 (shall enter into force upon the expiration of ten calendar days after the day of its first official publication); as amended by the Joint Order of the Acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated May 16, 2023 No. 358 and the Minister of National Economy of the Republic of Kazakhstan dated May 16, 2023 No. 67 (shall enter into force upon the expiration of sixty calendar days after the day of its first official publication).
In respect of: subsoil users carrying out the recording, storage, preservation and verification of geological information
Name of the homogeneous group of controlled entities (facilities)
State body that ordered the inspection/preventive control with a visit to the controlled entity (facility)
Act on ordering the inspection/preventive control with a visit to the controlled entity (facility)
No., date
Name of the controlled entity (facility)
(Individual Identification Number), Business Identification Number of the controlled entity (facility)
Location address
Download
| No. | List of Requirements | Complies with Requirements | Does Not Comply with Requirements |
|---|---|---|---|
| 1 | 2 | 3 | 4 |
| 1 | Availability of records and preservation of geological information and its carriers obtained as a result of subsoil use operations, as well as unobstructed access thereto for representatives of the authorized body for subsoil study for the purposes of research or inspection | ||
| 2 | Submission to the authorized body for subsoil study of reports on the operation of underground structures | ||
| 3 | Compliance with the requirements for documenting all works involving the use of underground space. The documentation shall include a description of the works necessary for the reliable study and subsequent development of the subsoil plot | ||
| 4 | Ensuring the reliability and preservation of all primary and secondary geological information obtained during the use of underground space, including laboratory research and analysis data |
Official(s)
Position, signature
Surname, first name, patronymic (if any)
Head of the controlled entity
Position, signature
Surname, first name, patronymic (if any)
| Appendix 8 to the Joint Order of the Minister for Investment and Development of the Republic of Kazakhstan dated December 23, 2015 No. 1222 and the Minister of National Economy of the Republic of Kazakhstan dated December 26, 2015 No. 796 |
|---|
Inspection Checklist in the Field of Subsoil Study and Use
Footnote. The Joint Order was supplemented by Appendix 8 in accordance with the Joint Order of the Acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated May 16, 2023 No. 358 and the Minister of National Economy of the Republic of Kazakhstan dated May 16, 2023 No. 67 (shall enter into force upon the expiration of sixty calendar days after the day of its first official publication).
In respect of: subsoil users carrying out geological exploration of the subsoil, exploration for solid minerals, extraction of common minerals and solid minerals, with the exception of uranium, artisanal mining, use of underground space, recording, storage, preservation and verification of geological information
Name of the homogeneous group of controlled entities (facilities)
State body that ordered the inspection
Act on ordering the inspection
No., date
Name of the controlled entity (facility)
(Individual Identification Number), Business Identification Number of the controlled entity (facility)
Location address
Download
| No. | List of Requirements | Complies with Requirements | Does Not Comply with Requirements |
|---|---|---|---|
| 1 | 2 | 3 | 4 |
| 1 | Compliance with the requirements for documenting works carried out under a license for geological exploration of the subsoil and recording all information necessary for reliable study of the subsoil | ||
| 2 | Compliance with the prohibition on erecting permanent structures, permanently stockpiling and storing explosives, creating pits, shafts, trenches and other types of mine workings, as well as carrying out stripping operations (for licenses for geological exploration of the subsoil) | ||
| 3 | Compliance with the deadlines for submitting periodic geological reports under a license for geological exploration of the subsoil (no later than April 30 of each year) | ||
| 4 | Ensuring the free transfer of geological information obtained by the subsoil user as a result of geological exploration for use by the authorized body for subsoil study within one month from the expiration of the license term | ||
| 5 | Compliance with the deadlines for submitting the final report on the results of geological exploration to the authorized body for subsoil study (no later than three months from the date of termination of the license) | ||
| 6 | Submission of the following periodic reports under a production license: 1) geological reports – where exploration is carried out on the subsoil plot; 2) report on extracted minerals | ||
| 7 | Compliance with the prohibition on alienating natural carriers of geological information obtained as a result of subsoil use operations during the term of the subsoil use contract or license, except in the following cases: - The subsoil user shall be entitled to export natural carriers of geological information in the form of cores, rock and mineral samples, specimens, collections of stone material, thin sections, polished sections, mineral solutions and powders outside the Republic of Kazakhstan exclusively for the purposes of research and analysis. - Alienation by the subsoil user of natural carriers of geological information in the form of samples and/or export of samples by the subsoil user outside the Republic of Kazakhstan shall be carried out with the permission of the authorized body for subsoil study | ||
| 8 | Placement of man-made mineral formations of mining and processing (beneficiation) facilities within subsoil plots held for use under a license | ||
| 9 | Notification of the competent authority (the state body that is a party to the contract and/or issued the subsoil use license) of amendments to project documents within the prescribed period | ||
| 10 | Placement of man-made mineral formations of mining and processing (beneficiation) facilities within subsoil plots held for use under a license | ||
| 11 | Compliance with restrictions on the use of mechanized equipment предусмотренные условиями лицензии | ||
| 12 | Submission of a periodic report on extracted precious metals and precious stones to the local executive body of the region that issued the artisanal mining license |
Official(s)
Position, signature
Surname, first name, patronymic (if any)
Head of the controlled entity
Position, signature
Surname, first name, patronymic (if any)
Constitution Law Code Regulatory Act Decree Order Decision Resolution Lawyer Almaty Lawyer Legal Service Legal Consultation Civil Criminal Administrative Cases Disputes Defense Arbitration Legal Company Kazakhstan Law Office Court Cases Declaration Decree Order Resolution Decision Report Conclusion Application Conclusion Convention Contract Memorandum Methodology Rules Note Regulations Program Charter Charter Article Commentary Resolution Regulation Protocol Draft Program Rules Messages